COD GALBEN: 23-03-2025 ora 10 Intre 24 martie, ora 9 - 24 martie, ora 21    Fenomene vizate se va semnala 24 martie, ora 9 - 24 martie, ora 21    Fenomene vizate

Click pe fotografie pentru a o mari
Descriere: epa07822212 Polish workers build a temporary sewage pipeline across a pontoon bridge to stop waste from being dumped into the Vistula River after the city's main sewage collector pipeline and its backup failed, Warsaw, Poland, 06 September 2019. Both temporary sewage pipelines across a pontoon bridge designed to stop waste from being dumped into the Vistula River in Warsaw. The main collector pipe feeding the 'Czajka' sewage treatment works in Warsaw started malfunctioning on 27 August, as a result of which the system switched to a back-up pipe, which also failed a day later. As a result of the malfunction, the capital's water authority decided to conduct a controlled discharge of waste into the Vistula. EPA/MARCIN OBARA POLAND OUT
Cuvinte cheie:
ID fotografie: 13038602
Autor: MARCIN OBARA
Credit:
Redactor: EPA
Locatie: Warsaw - Poland
Dimensiune: 5568 x 3712 px
Realizat: 2019-09-06
Introdus: 2019-09-06 15:04:41
 Eveniment
 Autor
 Data
Monitorizare
Setări

DETALII DESPRE TINE

Dacă ai cont gratuit te loghezi cu adresa de email. Pentru a crea un cont gratuit accesează secțiunea “Crează cont”.

Dacă ai cont plătit te loghezi cu username. Pentru a vă crea un cont plătit vă rugăm să contactați:

Dacă nu puteți vizualiza această știre, contactați echipa AGERPRES pentru a vă abona la fluxurile de știri.