COD GALBEN: 22-03-2025 ora 10 Intre 23 martie, ora 9 - 23 martie, ora 23 se va semnala intensificări ale vântului

Click pe fotografie pentru a o mari
Descriere: epa07508114 A handout photo made available by the Tokyo Electric Company shows a general view of the cooling pool, where remote-controlled removal work of the nuclear fuel has started, at the at Tokyo Electric Company's (TEPCO) Fukushima Daiichi Nuclear Power Unit 3 in Okuma, Fukushima Prefecture, Tokyo, Japan, 15 April 2019. TEPCO announced it has started removing fuel from a cooling pool at Unit 3 after a melted down was triggered following the 2011 tsunami, caused by a 6.6 magnitude earthquake in Fukushima Prefecture. EPA/TOKYO ELECTRIC COMPANY HANDOUT EDITORIAL USE ONLY/HANDOUT/NO SALES, BEST QUALITY AVAILABLE HANDOUT EDITORIAL USE ONLY/NO SALES
Cuvinte cheie:
ID fotografie: 12320935
Credit:
Redactor: EPA
Locatie: TOKYO - Japan
Dimensiune: 512 x 342 px
Realizat: 2019-04-15
Introdus: 2019-04-15 15:00:33
 Eveniment
 Autor
 Data
Monitorizare
Setări

DETALII DESPRE TINE

Dacă ai cont gratuit te loghezi cu adresa de email. Pentru a crea un cont gratuit accesează secțiunea “Crează cont”.

Dacă ai cont plătit te loghezi cu username. Pentru a vă crea un cont plătit vă rugăm să contactați:

Dacă nu puteți vizualiza această știre, contactați echipa AGERPRES pentru a vă abona la fluxurile de știri.