Click pe fotografie pentru a o mari
Descriere: epa08656541 A view on a temporary sewage pipeline across a pontoon bridge to stop waste from being dumped into the Vistula River after the city's main sewage collector pipeline and its backup failed, in Warsaw, Poland, 09 September 2020. The construction should be completed by 10 September, which is to carry an alternative pipeline transporting Warsaw sewage to the Czajka treatment plant in northern Warsaw. A pipe sending sewage to the Czajka treatment plant in northern Warsaw had a breakdown on 05 September, just a year after the main collector pipe failed. This prompted Warsaw authorities to carry out a controlled discharge of waste into the Vistula River. EPA/MATEUSZ MAREK POLAND OUT
Cuvinte cheie:
ID fotografie: 14005134
Autor: MATEUSZ MAREK
Credit:
Redactor: EPA
Locatie: WARSAW - Poland
Dimensiune: 6240 x 4160 px
Realizat: 2020-09-09
Introdus: 2020-09-09 16:08:50
 Eveniment
 Autor
 Data
2020-09-09
Monitorizare
Setări

DETALII DESPRE TINE

Dacă ai cont gratuit te loghezi cu adresa de email. Pentru a crea un cont gratuit accesează secțiunea “Crează cont”.

Dacă ai cont plătit te loghezi cu username. Pentru a vă crea un cont plătit vă rugăm să contactați:

Dacă nu puteți vizualiza această știre, contactați echipa AGERPRES pentru a vă abona la fluxurile de știri.